Export desk · Hangzhou, China · Mon–Sat 08:30–18:00 (GMT+8) market@metongmachinery.com Direct line to engineering

Batch mixing plants: weighing, screening, batching and dust control

Stationary batch plants organize cold feed, drying, screening, weighing, mixing, finished storage and environmental equipment as one production system.

CategoryAsphalt productionContent typeEquipment referencePeopleNo

Equipment role

Batch plants produce hot asphalt mixture for highway, municipal, airfield and depot construction. The main subsystems are aggregate feed and drying, hot screening, weighing, batch mixing, finished-product silo, asphalt tankage and dust extraction.

Engineering purpose

Batch plants are commonly preferred when several mix designs must be switched during the programme. Each batch is weighed and mixed separately, which gives the specification a clear control point; layout and environmental package must be planned against local permit requirements.

What to confirm in the enquiry

Rated output, mixer batch size, cold-feed bin count, finished silo volume, asphalt tank count, installed power, transformer size, dust-collection configuration, module dimensions, foundation notes and emission-control basis.

Related equipment

Open DLB3000 Stationary Batch Plant

Buyer preparation

Questions an overseas purchaser should answer before the quote

These points help engineering compare models, avoid unsuitable oversized or undersized options, and prepare the correct technical and commercial document set.

How do buyers choose the right model in this equipment class?

Start with the application and material, not the model number. Compare asphalt production capacity basis, working width or output, chassis or skid option, control arrangement, maintenance access and transport dimensions against the project datasheet.

What details make the quotation technically useful?

Include the main task, material type, expected duty cycle, site access, utility conditions, target timing, destination port, required certificates and any local approval requirement. Photographs or tender clauses help engineering give a specific answer.

Which commercial and technical items should be confirmed separately?

Final capacities and dimensions, configuration options, shipping mode, document set, commissioning guidance, operator-training scope and wear-parts plan should be confirmed in the written proposal rather than assumed from generic marketing copy.

This equipment reference summarizes public catalogue information and engineering selection points. Model capacity, dimensions, certification and commercial terms must be taken from the final datasheet, technical proposal or signed agreement.

Quotation

Tell us the project, we will spec the machine.

Send the application, the material and the output you need. You will get a configuration proposal with capacity, chassis options and delivery window — not a catalogue page.

  • Application-based selection
  • Export documents prepared before shipment
  • Commissioning guidance and spares planning
Email
market@metongmachinery.com
Office
No. 66 Shimin Street, Hangzhou, China
Export desk · direct line to engineering Request a quotation