Before the order
Application review, equipment-family comparison, configuration questions, tender-document support and a written quotation basis.
Engineering selection, documentation, shipment coordination, commissioning guidance, training and spare-parts communication for exported road equipment.
Metong treats selection, documentation, commissioning and spare-parts communication as part of the export purchase. The site publishes what can be confirmed from the manufacturer record; specific service visits, stock locations and warranty terms are agreed per project and written into the commercial arrangement.
Application review, equipment-family comparison, configuration questions, tender-document support and a written quotation basis.
Production coordination, pre-delivery inspection records, document preparation, packing and shipment notes for the selected machine.
Manuals, diagrams, parts lists, commissioning guidance, operator training topics and follow-up technical communication.

Assembly, inspection and pre-delivery preparation
The export desk routes the enquiry to the relevant product engineer. The discussion starts with application, material, required output and site constraints; the reply proposes a configuration direction rather than a generic catalogue description.
Fabrication, assembly, pressure or leak checks, calibration and functional tests follow the production process described on the manufacturing page. Pre-delivery checks are recorded before the machine is released for shipment.
The shipped document set includes the operation and maintenance manual, wiring and hydraulic schematics where applicable, spare parts list, certificate of origin, commercial documents and functional test records. Market-specific requirements should be stated before the order.
Truck-mounted units may be prepared as complete vehicles or suitable transport arrangements; plants and binder equipment are usually shipped as modules. Actual dimensions, lifting points, packing and destination-port requirements are confirmed for the selected configuration.
First-startup guidance covers control checks, calibration points, safe operation, routine maintenance and a witnessed function check. Operator and mechanic training scope, language and attendance are agreed according to the project.
Repeat wear parts, filters, seals, nozzles and wear components are referenced from the parts list. Technical questions are answered against the model, photographs, measurements and symptoms supplied by the buyer.
| Topic | What Metong prepares | What the buyer provides |
|---|---|---|
| Parts and manuals | Final datasheet, parts list, operation/maintenance document and applicable diagrams. | Send the model, serial number if available, required component and destination. |
| Commissioning | Startup checklist, control calibration points and function-test items. | Confirm utilities, access, operating crew and the agreed service scope. |
| Training | Operator controls, safe startup and shutdown, daily checks and routine maintenance points. | State the crew size, preferred language and whether training is remote or on site. |
| Technical diagnosis | Problem review based on model, photographs, measurements, alarms and symptoms. | Include clear photos of the component, control screen and affected function. |
| Tender support | Specification wording, certificates, test records and document lists relevant to the submission. | Quote the tender clause or document requirement at enquiry stage. |
| Custom configuration | Chassis, tank or hopper arrangement, control option and safety set discussed against a written requirement. | Provide the material, duty cycle, site condition and any local approval constraint. |
Site service scope, timing and cost are confirmed in the project agreement. Remote engineering support, document exchange and parts coordination begin at the enquiry stage; local technician claims are not made unless a real arrangement exists for the market.
Include the model name, serial number if known, the component or wear part from the parts list, the symptom or reason for replacement, expected quantity and destination port or city.
The standard document set covers operation and maintenance information, applicable diagrams, spare parts list, origin and commercial documents, and pre-delivery functional records. Foundation plans, drawings and market-specific approvals are issued according to the confirmed project requirement.
Yes, when the requirement is written down. Engineering compares chassis, tank or hopper arrangement, heating or control options, safety equipment and transport constraints; final capacities and dimensions are confirmed in the quotation rather than assumed from a catalogue image.
Warranty scope, exclusions and acceptance procedures follow the signed commercial contract. Pre-delivery test records, manuals and parts lists are prepared to support acceptance and later maintenance.
Send the application, the material and the output you need. You will get a configuration proposal with capacity, chassis options and delivery window — not a catalogue page.