Rubber asphalt plants, emulsion plants, polymer modification units, drummed-bitumen melters and heated transport tanks.
Binder quality is where most surface failures begin. Metong designs the processing side of the chain: crumb-rubber and polymer modification under PLC control, emulsion plants with colloid mills sized to the daily binder demand, and melting equipment that recovers drummed bitumen without scorching it.
Units are offered as container-frame skid plants, mobile trailer plants or fixed stations, with capacities from 6 t/h to 30 t/h. Each package includes heated storage, metering pumps and a control system that logs batch data, so a contractor can prove the binder that went into the road.

Crumb-rubber modified binder production under continuous shear and temperature control, in container-frame and mobile formats.

Mobile modular wet-process rubber bitumen plants at 10 or 20 t/h with controlled crumb-rubber ratio.
AR10 / AR20Details →
Trailer-mounted rubber asphalt unit that follows the paving spread between sites.
AR-MDetails →Colloid-mill emulsion plants producing cationic and modified emulsions at 6 to 10 t/h, with manual or semi-automatic control.

Colloid-mill emulsion plant, 6 to 10 t/h, manual or semi-automatic control.
MTR SeriesDetails →
Container-frame plant producing modified emulsion at 6 t/h.
MTR6Details →
10 t/h modified emulsion line with in-line metering and heated storage.
MTR10ADetails →SBS, EVA and PE modification units with high-shear mills and PLC recipe control for pavement-grade binder.
Drummed-bitumen melters that recover binder from steel drums without local overheating, from 2 to 8 t/h.
Send the application, the material and the output you need. You will get a configuration proposal with capacity, chassis options and delivery window — not a catalogue page.