Export desk · Hangzhou, China · Mon–Sat 08:30–18:00 (GMT+8) market@metongmachinery.com Direct line to engineering

Micro-surfacing units for rut filling and thin surface restoration

Micro-surfacing equipment meters emulsion, aggregate, water, filler and additives, mixes them in a pugmill and places the material through a spreader box.

CategoryCold mix surface treatmentContent typeEquipment referencePeopleNo

Equipment role

Micro-surfacing units prepare and place chemically stabilized cold surfacing material. They are associated with wheel-path rut filling, surface texture restoration, skid improvement and preventive maintenance on structurally sound pavements.

Engineering purpose

The machine must hold the ratio of emulsion, aggregate, filler and water as paver speed changes. Independent feed systems and a consistent spreader box help control thickness and joint texture; material recipe and pavement preparation determine whether the treatment performs.

What to confirm in the enquiry

Aggregate bin and water tank capacities, filler capacity, metering accuracy, pugmill size, spreader-box width, chassis or trailer option, control system and available operator documentation. The emulsion grade and mix design should be supplied or agreed before quotation.

Related equipment

Open LMT5310TXF Micro-Surfacing Paver

Buyer preparation

Questions an overseas purchaser should answer before the quote

These points help engineering compare models, avoid unsuitable oversized or undersized options, and prepare the correct technical and commercial document set.

How do buyers choose the right model in this equipment class?

Start with the application and material, not the model number. Compare cold mix surface treatment capacity basis, working width or output, chassis or skid option, control arrangement, maintenance access and transport dimensions against the project datasheet.

What details make the quotation technically useful?

Include the main task, material type, expected duty cycle, site access, utility conditions, target timing, destination port, required certificates and any local approval requirement. Photographs or tender clauses help engineering give a specific answer.

Which commercial and technical items should be confirmed separately?

Final capacities and dimensions, configuration options, shipping mode, document set, commissioning guidance, operator-training scope and wear-parts plan should be confirmed in the written proposal rather than assumed from generic marketing copy.

This equipment reference summarizes public catalogue information and engineering selection points. Model capacity, dimensions, certification and commercial terms must be taken from the final datasheet, technical proposal or signed agreement.

Quotation

Tell us the project, we will spec the machine.

Send the application, the material and the output you need. You will get a configuration proposal with capacity, chassis options and delivery window — not a catalogue page.

  • Application-based selection
  • Export documents prepared before shipment
  • Commissioning guidance and spares planning
Email
market@metongmachinery.com
Office
No. 66 Shimin Street, Hangzhou, China
Export desk · direct line to engineering Request a quotation