Modified bitumen fails for one of three reasons: the modifier was not dispersed, the temperature was too high for too long, or the batch was not consistent. All three are process failures, and all three are visible in the plant's control system before the binder reaches the road.

Crumb rubber

Crumb-rubber modification needs sustained temperature and continuous agitation, because the rubber keeps reacting with the bitumen as it is stored. A rubber asphalt plant therefore carries a heated, agitated tank farm and a reaction time it can hold. Under-reacting gives a binder that separates in the tanker; over-reacting gives one that is too viscous to spray.

SBS and other polymers

Polymer modification needs high shear to break the polymer down and disperse it into the bitumen. A high-shear mill plus a hold-and-agitate cycle is the standard arrangement, with PLC recipe control so a batch is repeated rather than re-invented. SBS dosage is typically a few percent by mass and is measured, not estimated.

Storage and the last mile

Modified binder must stay hot and agitated from plant to sprayer. That is a transport problem as much as a production one: insulated tanks, hydraulic agitation and a discharge pump sized to the receiving equipment. A perfectly modified batch that cools in an unagitated tanker arrives as a separated batch.

What to specify

Mill type and shear rate, tank heating method and temperature control band, agitation during storage, batch size, and the control system's data logging. If a supplier cannot show a batch record, the consistency claim is unverifiable.

Metong engineering · Bitumen processing · 6 min read

Discuss this specification with engineering

Crumb rubber and SBS: what changes in the binder plant

Bitumen processing · 6 min read

Continue

Other notes

Quotation

Tell us the project, we will spec the machine.

Send the application, the material and the output you need. You will get a configuration proposal with capacity, chassis options and delivery window — not a catalogue page.

  • Application-based selection
  • Export documents prepared before shipment
  • Commissioning guidance and spares planning
Email
market@metongmachinery.com
Office
No. 66 Shimin Street, Hangzhou, China
Export desk · direct line to engineering Request a quotation